 Our old kitchen Compare to new
 Choosing floor tile to match our colours - we took tile on right, wood on left
 Bob the electrician with new switches & outlet
 Dining room & Living room under plastic dust-shield
 Office & Living room under plastic dust-shield
 Vehbi removes old floor tile
 Bare walls and bare floor
 Vehbi installing floor tile
 Vehbi installing grout
 Lovely new floor with my idea of a square subway pattern
 Eddie filling holes in walls
 Frank the plumber removes pipes so cabinets can be installed
 Eddie installing cabinets with designer Walter
 Bob measuring for the engineered stone countertop
 Eddie and Irwin making sure the fridge-box is level
 Erwin installing high-gloss cabinets
 Fridge-box and Eddie sandwich
 Wes and Dominik installing the countertop
 Mario the plumber working on the dishwasher
 Finished sink: running water after 36 days without it!
 Vehbi puts grout on new wall tiles, also in my square subway pattern
 Stanley installs the remaining countertop
 The kitchen is now useable and almost complete
 We can use our stove for the first time in 44 days!
 Eddie and Irwin - almost done!
 70 days after rip-out, the kitchen is done (see old kitchen)
 The sink, dishwasher & fridge wall
 Another view
 Another view
 The other wall, opposite the sink wall
 The other wall, top half
 The other wall, Bottom half
 Designer Walter views the finished kitchen
 The wine rack with tall vertical spaces was my design
 Ice cube acrylic cabinet doors & glass shelves
 Pneumatic piston horizontal opening system
 Fully extendable, smooth sliding, self-closing drawers
 Pull-out unit brings items in the corner within reach
 Pull-out garbage and recycling containers
 Pull-out drawers under the sink
 Hidden towel rack - the last part finished
|