Our old kitchen    Compare to new


Choosing floor tile to match our colours - we took tile on right, wood on left


Bob the electrician with new switches & outlet


Dining room & Living room under plastic dust-shield


Office & Living room under plastic dust-shield


Vehbi removes old floor tile


Bare walls and bare floor


Vehbi installing floor tile


Vehbi installing grout


Lovely new floor with my idea of a square subway pattern


Eddie filling holes in walls


Frank the plumber removes pipes so cabinets can be installed


Eddie installing cabinets with designer Walter


Bob measuring for the engineered stone countertop


Eddie and Irwin making sure the fridge-box is level


Erwin installing high-gloss cabinets


Fridge-box and Eddie sandwich


Wes and Dominik installing the countertop


Mario the plumber working on the dishwasher


Finished sink: running water after 36 days without it!


Vehbi puts grout on new wall tiles, also in my square subway pattern


Stanley installs the remaining countertop


The kitchen is now useable and almost complete


We can use our stove for the first time in 44 days!


Eddie and Irwin - almost done!


70 days after rip-out, the kitchen is done  (see old kitchen)


The sink, dishwasher & fridge wall


Another view


Another view


The other wall, opposite the sink wall


The other wall, top half


The other wall, Bottom half


Designer Walter views the finished kitchen


The wine rack with tall vertical spaces was my design


Ice cube acrylic cabinet doors & glass shelves


Pneumatic piston horizontal opening system


Fully extendable, smooth sliding, self-closing drawers


Pull-out unit brings items in the corner within reach


Pull-out garbage and recycling containers


Pull-out drawers under the sink


Hidden towel rack - the last part finished